11. CNR / CPR

Alternative 2
CNR to East, CPR to West of Existing Alignments
(the Preferred Alternative)

  • Largest potential impact on natural environment
  • No additional property required
  • Minimal area of archaeological potential may be displaced
  • Minimal disruption to rail operations
  • Minimal track closures required during construction

Alternative 5
CNR Staged on Existing Alignment
CPR to West of Existing Alignment
(not preferred)

  • Minor impacts to natural environment
  • No additional property required
  • Minimal area of archaeological potential may be displaced
  • Significant disruption to CN rail operations due to one track closure required during construction

Alternative 7
CNR Staged on Existing Alignment,
CPR on Existing Alignment with Temporary Bridge
(not preferred)

  • Minor, temporary impacts to the natural environment
  • Significant disruption to CN rail operations due to one track closure during construction