9. Lemonville Road Underpass

Evaluation of Alternatives

Alternative 1
Separate Structures
(the Preferred Alternative)

  • Lower construction cost
  • Minor impacts to natural and cultural environments associated with infill required between crossing structures
  • Impacts may be negligible

Separate Structures

Alternative 2
One Structure Spanning
Highway 403 and CNR
(not preferred)

  • Larger construction cost

One Structure Spanning Highway 403 and CNR